How Do You Prepare Zero Air and Span Gas for Ozone Monitor Calibration?
Ask a gas supplier for a cylinder of ozone at 500 ppb and the request comes back with a polite refusal. Ozone cannot be shipped as a bottled gas. It decays within minutes to hours, and it attacks the metal and elastomer surfaces inside a regulator. Whatever went into the cylinder is not what reaches your analyzer.
That one fact shapes the whole job. Every ozone calibration is two jobs stacked together: make gas with no ozone in it, then make gas with a known amount of ozone in it. The first is plumbing and patience; the second needs a reference, and the reference is where errors start.
![]()
Why is zero air not the same as clean air?
Zero air means gas the instrument should read as nothing. Compressed plant air, even after a dryer and a filter, is not zero air: it can carry a few ppb of ozone from the compressor, traces of nitrogen oxides, and enough hydrocarbon to shift an electrochemical cell. If the gas going in contains something the sensor responds to, the zero you set is wrong and every span value on top of it inherits the error.
What the supply has to deliver:
- Ozone destroyed, not just filtered. A particulate filter does nothing to ozone. You need a scrubber medium such as activated carbon or manganese dioxide material, placed after the filter so dust does not blind it.
- Water removed. A desiccant stage keeps condensate out of the cell and holds the dew point steady.
- Stable supply pressure. Most benchtop monitors measure near ambient pressure inside the cell. A surging supply moves the reading even when the ozone content has not changed.
- No oil mist, no solvent vapour. Both form films on the optical window, and a film looks exactly like extra absorbance.
Two failures are worth knowing by name. Scrubber breakthrough: carbon in service long enough stops removing ozone and the zero creeps upward. Carbon fines: a scrubber installed without a downstream filter sheds dust into the cell. If zero has been rising for weeks, suspect the scrubber before the sensor.
Do not turn the zero knob until the display reads 0.000. Let it settle for the manual's warm-up period, watch for stability, then trim.
How do you generate ozone at a known concentration?
Since no cylinder exists, the known value is created on site by one of three routes. Each has a different weak point, and that weak point is what to check before you trust the result.
1. A calibrator with its own reference photometer
Common in plants and labs that calibrate regularly. The unit generates ozone and measures its output with a built-in photometer, which becomes your reference, so the question shifts to when that reference was last verified. A calibrator whose reference has drifted produces a stable and completely wrong span gas.
2. A transfer standard
A transfer standard is an analyzer with a documented calibration against a higher reference, used only for passing values along. Laboratories following the U.S. EPA approach for ambient ozone work this way: the measurement principle and calibration procedure are set in the ambient air monitoring regulations, and the chain runs from a primary reference through transfer standards to the field instrument. The U.S. EPA Ambient Monitoring Technology Information Center publishes the supporting documents. A transfer standard is only as good as its last comparison, so its due date belongs in your record.
3. Gas phase titration
This route makes a known ozone concentration from two things you can buy: a certified nitric oxide standard and an ozone generator. Nitric oxide reacts with ozone quickly and almost completely, one molecule to one molecule. Feed a known amount of NO into a stream carrying excess ozone and what is left is the original amount minus the NO you added, giving a traceable value without an ozone reference photometer. It needs a certified NO standard in date, which is why labs use it and plants rarely do.
| Method | Where the known value comes from | What to check first |
|---|---|---|
| Calibrator with internal photometer | Its own UV measurement of the generated gas | Date of the calibrator's last verification |
| Transfer standard | Comparison against a higher reference | Comparison due date and storage conditions |
| Gas phase titration | Certified nitric oxide standard plus stoichiometry | NO certificate and its expiry |
| Bottled ozone mixture | Not available in practice | Ozone decays in cylinder and regulator |
Which plumbing details quietly ruin a calibration?
Gas that is correct at the generator can be wrong by the time it reaches the cell. The loss is rarely dramatic: a span that reads two or three percent low, unnoticed until an audit.
- Tubing material. PTFE, FEP or clean stainless steel. Silicone and general-purpose elastomers absorb ozone and release it slowly, which smears the step response and the value you are setting.
- Line length and dead volume. Long runs and unused tee branches hold gas below the stated concentration. Keep the run short and purge it before adjusting.
- Flow and venting. Feed through a tee with a small vent, so the cell sees calibration gas at its normal sample flow without being pressurised and ambient air cannot diffuse back in.
- Pressure at the cell. A photometric monitor measures absorbance over a fixed path at the pressure inside the cell. Push gas in harder and the number changes for reasons unrelated to the gas.
- Humidity. Water vapour is not a strong absorber at 254 nm, but condensation on the window is fatal, and an electrochemical cell responds to humidity at its baseline. Match the calibration gas to the service condition where the manual asks for it.
- Temperature. Gas from a regulator can be cooler than the bench. Give line and cell time to equalise, or the first span reading is the one to discard.
What is the right order of operations?
- Check for leaks first. A leak on the inlet side pulls room air in and makes zero look high; a leak downstream makes the cell see less gas than the flow meter suggests.
- Run zero air and let it stabilise. Record the reading before adjusting. A zero that was already off by a known amount is information about the scrubber, the window and the lamp.
- Adjust zero, then confirm it holds. If it will not sit still, stop. Spanning an unstable zero spreads the instability across the whole range.
- Switch to span gas and allow full purge. Wait for the value to flatten, then adjust. Record where it started.
- Return to zero and check again. The step people skip. If zero moved after spanning, the span gas brought something in, usually moisture or contamination.
- Repeat the span once. Agreement between two checks says the gas path is stable. Disagreement sends you to the regulator, the tubing or the calibrator.
If the instrument reads low in service but calibrates normally on the bench, the sample system is the likely cause rather than the sensor; the causes of a low ozone reading are worth working through first. If zero keeps moving between calibrations, that pattern is described in zero drift versus span drift. How often to repeat the whole procedure is covered in calibration frequency for ozone detectors.
What should be written in the calibration record?
A calibration nobody can reconstruct later did not really happen. The record should let a second person repeat the work: date, operator, instrument serial number; zero before and after adjustment with stability; span concentration, the reference behind it and that reference's due date; measured flow, temperature and humidity; span before and after adjustment plus the repeat check; age of scrubber, filter and UV lamp; and the pass or fail decision against your acceptance limit.
A short checklist before you sign the sheet
- Zero air passes through an ozone scrubber with a filter behind it, and the scrubber is in date.
- The span reference is in calibration, and you can name it.
- Tubing is PTFE, FEP or stainless, and short.
- The cell sits at ambient pressure, fed through a vented tee.
- Zero was re-checked after spanning and did not move.
- Two span checks agree within your acceptance limit.
Dissolved ozone loops follow the same logic with one addition: the reference has to match the water chemistry, which is why dissolved ozone monitoring uses a different calibration path from gas-phase work. Where the analyzer sits, and what the sample line does to the gas before it arrives, is covered in ozone monitor placement. Where the sample point is some distance away, sample handling accessories are part of the calibration path, not an afterthought.
None of this is difficult. It is a set of small disciplines that only pay off together: gas with no ozone, gas with ozone you can trace, plumbing that steals none of it, and a record that shows you checked. Our reference list collects the guidance behind these practices.